6 - 5 INPUT TEST
When INPUT TEST is selected, the MONITOR will show the following, allowingyou to watch the status of each switch. On the screen, periodically checkthe status of each switch.
1.> By pressing each switch, if the display on the right-handside of the name of each switch changes to ON from OFF, the SW and the wiringconnections are satisfactory.
2.> Open the COIN CHUTE DOOR and insert a coin fromthe COIN ENTRY to check the COIN CHUTE SW.
6 - 6 OUTPUT TEST
Choose OUTPUT TEST to cause the following lower screen to appear. Inthe test, periodically adjust the projector and check the status of eachlamp.
Choose OUTPUT TEST to have the MONITOR screen shown left to appear. This screen allows status to be checked. Periodically check the lamp status in this mode.
Press the SERVICE BUTTON to move the arrow to the desired lamp test item.
Press the TEST BUTTON. If the dispay to the right of the lamp changes to ON from OFF, the lamp and wiring connection are satisfactory.
Choose EXIT and press the TEST BUTTON to return to MENU MODE.