ITEMS |
DESCRIPTION |
---|---|
INSTALLATION OF MACHINE | When the machine is installed, perform the following: |
1. Check to see that each setting is per the manufacturer's default setting, made at the time of shipment. | |
2. In the Input Test, check each switch and control. | |
3. In the Output Test check each of the lamps. | |
4. In the Memory and T.G.P. Tests, check ICs. | |
MEMORY | Choose Memory or T.G.P. Test to allow the memory test to be performed. In these tests, PROGRAM RAMs, ROMs, and ICs on the IC Board are checked. |
PERIODIC SERVICING | Periodically perform the following: |
1. Memory and T.G.P. Tests. | |
2. Ascertain each setting. | |
3. In the Input Test, test the control devices. | |
4. In the Output Test, check each of lamps. | |
CONTROL SYSTEM | 1. In the Input Test, check each switch. |
2. Adjust or replace each switch. | |
3. If the problem can not be solved yet, check the control's motion. | |
MONITOR | 1. In the C.R.T. Test, check to see if the monitor adjustments are appropriate. |
2. Demagnetize monitor using degauss switch on Service Panel. | |
IC BOARD | 1. Memory Test. |
2. Sound Test. | |
DATA CHECK | Check such data as game play time and histogram to adjust the difficulty level, etc. |