1) ASSEMBLING THE FRONT CABINET
1. By using the designated screws, secure the 2 Billboard Hooksto the Projection Display ceiling (Fig. 6.1a).
2. Support the Billboard by 2 people, insert it to the BillboardHooks as shown, and secure with 3 screws. (Fig. 6.1 b)
3. Take out the 2 screws to remove the Hole Lid from the backsideof the Billboard.
4. Insert the Billboard's wiring connector into the TerminalBoard on the ceiling of the Projection Display.
5. Install the Hole Lid with the 2 screws.
To ensure safety, perform the Billboard's installation workby 2 or more persons.
To perform work safely and securely, be sure to prepare a stepwhich is in a secure and stable condition.