[Previous Page] [Next Page] [Table of Contents]


 

[1. ] ASSY OF CABINETS AND BILLBOARD INSTALLATION

 

It is difficult to carry out work by one person. Be sure to perform work by plural persons. To perform work safely and securely, be sure to prepare a step which is in a secure and stable condition. Not using a step or using an ustable step can cause a violent falling down accident.


<ASSEMBLING THE FRONT CABINET>

Remove the SHIPPING BRACKET installed at the time of shipment and the 2 Bolts used for MONITOR locking.

Widen the space between the 2 monitors as shown.

Open the Shield Case Door (refer to HOW TO REMOVE THE GAME BD, Section 16) and connect the 3 connectors (atotal of 6, 3 each on both sides) shown.

 


Install the JOINT PIPE in between the 2 monitors.

Install MAP SASH LOWER to MAP HOLDER.

Install the Map Holder assembled as per 5 above to the front cabinet. Securely insert the lower end part of the Map Plate into the Map Holder and secure the upper part of the Map Plate with Map Sash Upper.